Files
flyer-crawler.projectium.com/docs/adr/adr-implementation-tracker.md
Torben Sorensen f10c6c0cd6
All checks were successful
Deploy to Test Environment / deploy-to-test (push) Successful in 17m56s
Complete ADR-008 Phase 2
2026-01-27 11:06:09 -08:00

17 KiB

ADR Implementation Tracker

This document tracks the implementation status and estimated effort for all Architectural Decision Records (ADRs).

Effort Estimation Guide

Rating Description Typical Duration
S Small - Simple, isolated changes 1-2 hours
M Medium - Multiple files, some testing Half day to 1 day
L Large - Significant refactoring, many files 1-3 days
XL Extra Large - Major architectural change 1+ weeks

Implementation Status Overview

Status Count
Accepted (Fully Implemented) 40
Partially Implemented 2
Proposed (Not Started) 14

Detailed Implementation Status

Category 1: Foundational / Core Infrastructure

ADR Title Status Effort Notes
ADR-002 Transaction Management Accepted - Fully implemented
ADR-007 Configuration & Secrets Accepted - Fully implemented
ADR-020 Health Checks Accepted - Fully implemented
ADR-030 Circuit Breaker Proposed L New resilience patterns needed

Category 2: Data Management

ADR Title Status Effort Notes
ADR-009 Caching Strategy Accepted - Fully implemented
ADR-013 Schema Migrations v1 Proposed M Superseded by ADR-023
ADR-019 Backup & Recovery Accepted - Fully implemented
ADR-023 Schema Migrations v2 Proposed L Requires tooling setup
ADR-031 Data Retention & Privacy Proposed XL Legal/compliance review needed

Category 3: API & Integration

ADR Title Status Effort Notes
ADR-003 Input Validation Accepted - Fully implemented
ADR-008 API Versioning Accepted - Phase 2 complete, tests migrated
ADR-018 API Documentation Accepted - OpenAPI/Swagger implemented
ADR-022 Real-time Notifications Accepted - Fully implemented
ADR-028 Response Standardization Accepted - Completed (routes, middleware, tests)

Category 4: Security & Compliance

ADR Title Status Effort Notes
ADR-001 Error Handling Accepted - Fully implemented
ADR-011 Authorization & RBAC Proposed XL Policy engine, permission system
ADR-016 Security Hardening Accepted - Fully implemented
ADR-029 Secret Rotation Proposed L Infrastructure changes needed
ADR-032 Rate Limiting Accepted - Fully implemented
ADR-033 File Upload & Storage Accepted - Fully implemented
ADR-048 Authentication Accepted - Fully implemented

Category 5: Observability & Monitoring

ADR Title Status Effort Notes
ADR-004 Structured Logging Accepted - Fully implemented
ADR-015 Error Tracking Accepted - Fully implemented
ADR-050 PostgreSQL Fn Observability Accepted - Fully implemented
ADR-051 Context Propagation Accepted - Fully implemented
ADR-052 Granular Debug Logging Accepted - Fully implemented
ADR-056 APM (Performance) Proposed M tracesSampleRate=0, intentionally disabled

Category 6: Deployment & Operations

ADR Title Status Effort Notes
ADR-006 Background Jobs Accepted - Fully implemented
ADR-014 Containerization Partial M Docker done, K8s pending
ADR-017 CI/CD & Branching Accepted - Fully implemented
ADR-024 Feature Flags Proposed M New service/library needed
ADR-037 Scheduled Jobs Accepted - Fully implemented
ADR-038 Graceful Shutdown Accepted - Fully implemented
ADR-053 Worker Health Accepted - Fully implemented
ADR-054 Bugsink-Gitea Sync Proposed L Automated issue creation

Category 7: Frontend / User Interface

ADR Title Status Effort Notes
ADR-005 State Management Accepted - Fully implemented
ADR-012 Component Library Partial L Core components done, design tokens pending
ADR-025 i18n & l10n Proposed XL All UI strings need extraction
ADR-026 Client-Side Logging Accepted - Fully implemented
ADR-044 Feature Organization Accepted - Fully implemented

Category 8: Development Workflow & Quality

ADR Title Status Effort Notes
ADR-010 Testing Strategy Accepted - Fully implemented
ADR-021 Formatting & Linting Accepted - Fully implemented
ADR-027 Naming Conventions Accepted - Fully implemented
ADR-040 Testing Economics Accepted - Fully implemented
ADR-045 Test Data Factories Accepted - Fully implemented
ADR-047 Project Organization Proposed XL Major reorganization

Category 9: Architecture Patterns

ADR Title Status Effort Notes
ADR-034 Repository Pattern Accepted - Fully implemented
ADR-035 Service Layer Accepted - Fully implemented
ADR-036 Event Bus Accepted - Fully implemented
ADR-039 Dependency Injection Accepted - Fully implemented
ADR-041 AI/Gemini Integration Accepted - Fully implemented
ADR-042 Email & Notifications Accepted - Fully implemented
ADR-043 Middleware Pipeline Accepted - Fully implemented
ADR-046 Image Processing Accepted - Fully implemented
ADR-049 Gamification System Accepted - Fully implemented
ADR-055 DB Normalization Accepted M API uses IDs, not strings

Work Still To Be Completed (Priority Order)

These ADRs are proposed or partially implemented, ordered by suggested implementation priority:

Priority ADR Title Status Effort Rationale
1 ADR-024 Feature Flags Proposed M Safer deployments, A/B testing
2 ADR-054 Bugsink-Gitea Sync Proposed L Automated issue tracking from errors
3 ADR-023 Schema Migrations v2 Proposed L Database evolution support
4 ADR-029 Secret Rotation Proposed L Security improvement
5 ADR-030 Circuit Breaker Proposed L Resilience improvement
6 ADR-056 APM (Performance) Proposed M Enable when performance issues arise
7 ADR-011 Authorization & RBAC Proposed XL Advanced permission system
8 ADR-025 i18n & l10n Proposed XL Multi-language support
9 ADR-031 Data Retention & Privacy Proposed XL Compliance requirements

Recent Implementation History

Date ADR Change
2026-01-27 ADR-008 Test path migration complete - 23 files, ~70 paths updated, 274->345 tests passing
2026-01-27 ADR-008 Phase 2 Complete - Version router factory, deprecation headers, 82 versioning tests
2026-01-26 ADR-015 Completed - Added Sentry user context in AuthProvider, now fully implemented
2026-01-26 ADR-056 Created - APM split from ADR-015, status Proposed (tracesSampleRate=0)
2026-01-26 ADR-015 Refactored to focus on error tracking only, temporarily status Partial
2026-01-26 ADR-048 Verified as fully implemented - JWT + OAuth authentication complete
2026-01-26 ADR-022 Verified as fully implemented - WebSocket notifications complete
2026-01-26 ADR-052 Marked as fully implemented - createScopedLogger complete
2026-01-26 ADR-053 Marked as fully implemented - /health/queues endpoint complete
2026-01-26 ADR-050 Marked as fully implemented - PostgreSQL function observability
2026-01-26 ADR-055 Created (renumbered from duplicate ADR-023) - DB normalization
2026-01-26 ADR-054 Added to tracker - Bugsink to Gitea issue synchronization
2026-01-26 ADR-053 Added to tracker - Worker health checks and monitoring
2026-01-26 ADR-052 Added to tracker - Granular debug logging strategy
2026-01-26 ADR-051 Added to tracker - Asynchronous context propagation
2026-01-26 ADR-048 Added to tracker - Authentication strategy
2026-01-26 ADR-040 Added to tracker - Testing economics and priorities
2026-01-17 ADR-054 Created - Bugsink-Gitea sync worker proposal
2026-01-11 ADR-050 Created - PostgreSQL function observability with fn_log()
2026-01-11 ADR-018 Implemented - OpenAPI/Swagger documentation at /docs/api-docs
2026-01-11 ADR-049 Created - Gamification system, achievements, and testing
2026-01-09 ADR-047 Created - Project file/folder organization with migration plan
2026-01-09 ADR-041 Created - AI/Gemini integration with model fallback
2026-01-09 ADR-042 Created - Email and notification architecture with BullMQ
2026-01-09 ADR-043 Created - Express middleware pipeline ordering and patterns
2026-01-09 ADR-044 Created - Frontend feature-based folder organization
2026-01-09 ADR-045 Created - Test data factory pattern for mock generation
2026-01-09 ADR-046 Created - Image processing pipeline with Sharp and EXIF stripping
2026-01-09 ADR-026 Fully implemented - client-side structured logger
2026-01-09 ADR-028 Fully implemented - all routes, middleware, and tests updated

Notes

  • Effort estimates are rough guidelines and may vary based on current codebase state
  • Dependencies between ADRs should be considered when planning implementation order
  • This document should be updated when ADRs are implemented or status changes